OSLC Tutorial: Business Use Case flow with DNG

Hi,

I am using CSM 2022x Refresh 2 with Teamwork Cloud and Collaborator plugins.

I am trying the OSLC integration capability with DNG by following one of your available tutorial https://docs.nomagic.com/CDH/latest/business-use-case-flow-with-dng-304012914.html but somehow, I am not ending with a similar result.
By the end of the flow, I should be able to view the CSM element (which I published as an OSLC resource with Collaborator) from DNG. But that was not the case.


Importing the DNG elements to Cameo went well and I was able to link the imported requirement to a model element with a satisfy relationship.

The problem is when I try to synch back to DNG, the satisfy relationship is skipped by DataHub, and no backlink in DNG is generated.

Was there any settings I need to do on the DNG side? Is it the mapping schema?

 

I hope you can help me find what I'm missing. Thanks in advanced.

 

Comments 0