Hello everyone,
I have a question and kinda problem with test specification and requirements. In ideal conditions test cases created and runs after requirements are finalized but Sometimes real life non-sequential. I have similar situation, I established links with test specification and test cases with requirement specification and test cases. I revised the requirement specification naturally requirements are updated. But when I check the test side, they stay linked with the previous (not updated one), naturally. Here is the problem and my questions.
If I want to change requirements and requirement specifications with most current one which already linked with test specification, is it possible automatically?
Do I manually break the links and create again with current requirements?
Thanks for your helps in advance