[GEOVIA] Surface Mine Designer

Functional Value

1. Improve the interoperability with downstream planning process through the ability to generate continuous haulage ramps.

2. Enable enhanced design alignment with the Optimized Mine Plan, offering Mine Planners unparalleled flexibility to meet diverse objectives

3. Improve key safety of the pit design through the ability to generate practical bench contours

I

I
The system generates additional geometrical sections to ensure the haulage connection

I
Comparison of the haulage centerline consistency between the previous and new versions

I
Enhance the ramp centerline alignement after adding the berm accesses

I
Pit design created by incorporating various phase surfaces

I
An error is displayed when the system detects a design conflict between the selected phases and the bench order

I
The ability to remove concave and convex small expansions remaining after running « Remove Small Extensions » command

I
Comparison of the pit contours shape after removing concave curvature

I
Comparison of the pit contours shape after removing convex curvature