[GEOVIA] Surface Mine Designer

Functional Value

1. Create practical and efficient pit designs through the ability to give priority to the practicability of the ramp design.

2. Create practical and efficient pit designs by improving the process that handles the small bench contours and the irrelevant toe contour expansions.

3. Greater customization and flexibility if offered by providing choices in defining the ramp gradient, such as inside/outside edge adjustments.

4. Improve the practicality, safety, and efficiency of surface ,mine designs by automatically recognizing common zones from the previous phase design and replicating them in the next phase.

5. Enhance design tool support for multiple phase design ensuring continuity of design elements such as ramps across phase designs.

I

I
The pit design remains unchanged in the common zones.

I
Comparison of the continuity in phase designs between the previous and new versions.

I
The continuity of the design elements, such as the ramps, across all phases.

I
The priority is given to the ramp continuity to ensure the haulage practicability.

I
Comparison of the ramp design between the previous and the new process (give priority to the ramp continuity).

I
Comparison between the three ramp gradient methods.