My inquiry is to find out what happens in background when you check in a drawing from a remote machine into workgroup pdm. What I have aproblem with is a specific workstation will check in models and assemblies all day without any problems, when a drawing is checked in themode goes fine, then the drawing starts and abou 90% of the way in the progress meter stops and about a minute later we get vault error 40. Since the models and assembllies have no issue I want to know what the PDM vault is trying to do that it has a network error. Would it be apermission for some sort of tem file, edraw etc creation ?
We also have lifecycles turned on. Thats another discussion alltogether. Any hints would be appreciated.
SolidworksWorkgroup Pdm