In the vault i have the assembly drawing attached not only to the assembly itself, but some of the parts and subassemblies of the main assembly.
When checking in the vault, the drawing is checked in multiple times. Is this normal?
In the vault i have the assembly drawing attached not only to the assembly itself, but some of the parts and subassemblies of the main assembly.
When checking in the vault, the drawing is checked in multiple times. Is this normal?