What is the standard way to revision your drawings?
Currently we use A - Z on the design drawings.
Once the design is approved we issue the drawing to production using revisions 1 -99
But how can you do this in PDM?
Or should I Use A01 - A99 for designs. and B01 - B99 for production Issues?
Thanks in advance.
Trev
SolidworksWorkgroup Pdm