As an admin, need to make significant changes to an existing work flow using SW 2014 EPDM. Seems like the best way is to make a copy of the existing workflow, make the changes to the new workflow using the existing workflow as a reference ie having both workflows open at the same time. Basically there are 2 states in the middle of the workflow that must be reveresed along with transitions, actions, etc. I'm looking for the least painful way to proceed. I've read something about export but dont see anything re import.
HELP ;-)
SolidworksSolidworks Pdm enterprise Pdm