Vault Validation

We have never validated your vault, excpet during an upgrade.  When a vault is validated, what happens.  There is a concern that drawing without links will be deleted, which may existed.  Is there a log that is available after the validation.

We are runing SW 2009.

Thanks

SolidworksWorkgroup Pdm