I have two design studies to run in different parts and I would like to run both of them overnight, because they take a long time to compute. Is there any way to run them via the Task Scheduler. I used the "Update Simulation" tool in the scheduler last night and that only ran the individual stress/thermal studies and did not update the Design Studys. Any help would be appreciated. Thanks.
-James
SolidworksSimulation