Update multiple sketches with new reference plane

Hi There,

I have made a change to an early feature in my design which has changed a referenced feature that was  used many times later in the design.  The later features that are using the changed reference plane now need to be updated.  I know that I can manually edit the reference plane for the individual sketches for each of the broken features, but this is time consuming. 

Is there a way to update multiple sketches with the new reference plane at once?

Thanks.

SolidworksSketching