Solidworks electrical wire mark

A couple of mixed questions for the experts in SWE:

I use  automatic wire numbering (usually Process/Renumber wires gives me more control than Process/Number new wires) to start our wiring number process, but usually leave some empty number, because it is never easy to have a 100 % defined schematic which is not subject to some feedback form our electrician, new wishes from our customer, etc. For example, I just numbered a first scheme using the automatic numbering and I had 1 to 13  numbers assigned, then I moved to the second scheme and I assigned number 21 to the first wire/equipotential. This way, numbers starting from equipotential 22 were assigned, which is great and exactly what I need in the next scheme.

 

Next time I want to assign some equipotential manually number 14 is suggested regardless of the last equipotential assigned (obviously until I elect 14 for some equipotential).

 

My questions are:

 

  1. Is this default behaviour customizable somehow ? Can I select the starting number anywhere?
  2. Besides, wire marks do not show by default for equipotentials  numbered manually, so this means a very cumbersome process where you first need to assign the equipotential, and then select "show/ide wire marks" for numbers to show.

 

Probably the answer to my first question is that I can´t but I wish I am missing something regarding my second question.