Hi,
I'm currently creating schedules manually. About 35, each a configuration of a big assembly. I'm scheduling an rendered animation, 6fps, 10sec length.
To create that schedule it takes Solidworks about 7 minutes to save the schedule. So, instead of creating the schedule manually, I was wondering if it's possible to write a macro that does the exact same.
Basicly the way to save each configuration is:
Kind regards,
Willie Roelofs
SolidworksApi macros