All,
I know there has to be a way to do this. We are wanting to convert some legacy CAD files that have been ECO'ed many times. As a result, they have had multiple Revisions. How can I put a file in the EPDM Vault and get it a Revision of something other than the first rev in EPDM.
Meaning, Drawing A has a current revision of "C" and it exists in AutoCAD. We want to convert to SolidWorks, so we ECO this drawing and create the new files in SolidWorks. How can I Release this drawing in Enterprise with a "D" revision without having to cycle through four times to get the correct Rev.
Hope this makes sense.
Rodney
SolidworksSolidworks Pdm enterprise Pdm