Revisions

All,

I know there has to be a way to do this.  We are wanting to convert some legacy CAD files that have been ECO'ed many times.  As a result, they have had multiple Revisions.  How can I put a file in the EPDM Vault and get it a Revision of something other than the first rev in EPDM. 

Meaning, Drawing A has a current revision of "C" and it exists in AutoCAD.  We want to convert to SolidWorks, so we ECO this drawing and create the new files in SolidWorks.  How can I Release this drawing in Enterprise with a "D" revision without having to cycle through four times to get the correct Rev.

Hope this makes sense.

Rodney

SolidworksSolidworks Pdm enterprise Pdm