My company has many pencil drawings with revisions. I need to bring them into SolidWorks but have them start with the next letter from latest revision letter. Example current pencil drawing ends with F. In SolidWorks I need to start with G. Currently in SolidWorks it satrts with A if I change it to G the next revision shows up as B.
SolidworksDrawings And Detailing