projected view with break lines doesn't update the break position

I have a parent drawing view with break lines.  The projected view created from the parent matches the break just fine.  BUT, when I decide to edit (change) the position of the break lines on the parent view the projected view breaks don't update to match.

SolidworksDrawings And Detailing