I get the wrong result
in the SolidWorks 2017 in the Linear Dynamic study – Harmonic analysis. The
time history graph is wrong. It was perfect in the SolidWorks 2016. Has anyone some experience with this analysis? Can you
help me?
I get the wrong result
in the SolidWorks 2017 in the Linear Dynamic study – Harmonic analysis. The
time history graph is wrong. It was perfect in the SolidWorks 2016. Has anyone some experience with this analysis? Can you
help me?