Hi,
One of our customer used to work on server, but recently they have started working on PDM, for that they have uploaded all the files in the PDM folder from server and checked in.
While opening the drawing from PDM the revision history is changing to A.01 for every drawing in the PDM,
even though the revision is B/C/D.. by default it is taking as A.01 and that is reflecting in the drawing.
Is there any option of getting the existing revision ?
SolidworksSolidworks Pdm enterprise Pdm