We have 4 to 5 PC's running solidworks. All drawings being created are connected to the 1 general arrangement drawing (GA). As the GA increases in size everyones PC's are getting slower, the system being used is big enough to handle the load with each PC using 12GB, connected to its own designated main drive. All the work is being edited and saved on the main drive. Should we be working from our personal PC's or does the system need some sort of updating or rebooting at the end of every day?
SolidworksGeneral