The use of linked values has been replaced by global variables in SolidWorks 2012.
In SolidWorks 2011 user had an ability to select multiple dimension from graphics and assign a linked values in one single command.
How to do this in SolidWorks 2012 version ?
It very time consuming to assign the global variable by selecting one dimension at a time.
SolidworksGeneral