We typically re-use projects when possible as a starting point for similar projects. I typically open a multi-sheet drawing and use Pack and Go to copy and rename parts/assemblies/drawings to a new folder. Whenever I do this, the BOMs stay linked to their correct assemblies, however the numbers following "Bill of Materials" in the feature tree have numbers that aren't in numerical order because I'll delete unnecessary pages (see the attached image).
Is there a macro to renumber these from
Bill of Materials17
Bill of Materials19
Bill of Materials23
etc.
to
Bill of Materials1
Bill of Materials2
Bill of Materials3
etc.?
SolidworksApi/macros