Hi all,
Is it possible to lock the transition (release) of a drawing if the part is not already released or at least released simultaneously? And vise versa when making a new revision?
It must be possible to release the part without the drawing and also making a revision on the drawing without the part.
Anyone having a suggestion?
Thanks in advance,
-Ronnie
SolidworksSolidworks Pdm enterprise Pdm