Hello All,
I hope some one out there can help me on this one.
I have an Assembly on sheet 1 of my drawing file with a BOM linked to it.
I have placed the base plate part file that i have used in the assembly onto sheet 2 and attached a secondary BOM to it.
How can I link the QTY in my first BOM to my second BOM?
Thanks for reading.
SolidworksDrawings And Detailing