it is much slower when several springs connectors added on pipe line instead of advanced fixtures.

Hi,

I found it is much slower when several springs connectors added on pipe line instead of advanced fixtures.

For thermal expansion pipe, it is better, i think, to apply spring connectors to simulate pipe hangers, but it is very time consuming. any suggestions about simulating pipe hangers on long pipe line?

Thanks first!

SolidworksSimulation