Is there a way to set the Date format when adding a Revision to a Revision Table?

Using the standard tables from SWX, I can add a Revision Table to a drawing. If I RMB on the table I can add a revision which will add a row to the table.

The Date column fills in todays date as XX/XX/XXXX. Is there a way I can set this date format to be XX/XX/XX?

SolidworksDrawings And Detailing