Or do I now have to go through my VAR and submit an SPR? It's related to Toolbox save time and is the same in SP0 as it was in one of the Betas.
SolidworksSolidworks 2012 Beta
Or do I now have to go through my VAR and submit an SPR? It's related to Toolbox save time and is the same in SP0 as it was in one of the Betas.
SolidworksSolidworks 2012 Beta