I'm working with an architect firm that builds in Revit but needs drawings which I do in SolidWorks. I convert their file SAT file to a STEP in Fusion 360 then open the STEP in SoldWorks to create drawings (awesome workflow right?). They recently had a fairly substantial revision to a model and I was wondering if there is any way to bring in this new STEP file and have it automatically update the previous drawing (or the previous SW file). I don't do tons of drawings so I'm not sure if this is possible or not, or if there is a better workflow in the future to avoid having to create all new drawings. Your thoughts are greatly appreciated.
Thanks!
-ryan
SolidworksDrawings And Detailing