Hi All,
I created 20 washers and 1 drawing with view ID = A, OD = B, & Thick = T. Then filled an excel file with variable parameter and pasted in drawings. It serves my basic purpose.
In our company they use PDM Vault. Is there any way to link 10 washers to that drawings.
I dont like inserting 20 washers in drawing.
Please let me know some better way to make this; so that it could be used as best practise.
Thanks,
SolidworksDrawings And Detailing