Dear ALL,
We are using Workgroup PDM 2009 sucessfully since last threemonths. Now we are very stable with the data. Now I need togenerate customised report based on request from our engineeringdepartment. I tried the report generation system og Workgroup PDM,its not very detailed and flexible. It just generate a normalreport.
Does anyone knows some tool or a method by which report can begenerated based on details required. For. E.g. To generate a reportwhere creator of the drawing is John and are revised by anyone inthe month May 09.
Regards
Jay DoshiSolidworksWorkgroup Pdm
We are using Workgroup PDM 2009 sucessfully since last threemonths. Now we are very stable with the data. Now I need togenerate customised report based on request from our engineeringdepartment. I tried the report generation system og Workgroup PDM,its not very detailed and flexible. It just generate a normalreport.
Does anyone knows some tool or a method by which report can begenerated based on details required. For. E.g. To generate a reportwhere creator of the drawing is John and are revised by anyone inthe month May 09.
Regards
Jay DoshiSolidworksWorkgroup Pdm