How to call a macro in a second swp project from another macro in the main project

Hello,

I have 2 swp projects (main and second). I want to call a method in the second project from a method in the main project.

Do you have an idea how to do this?

Thanks in advance for your feedback.

BR,

Johann.

SolidworksApi/macros