How do I populate local revision during the initial check in

When I check in a drawing for the first time the local revision shows No revision.

I have a couple of transitions/states that allow me to increase or decrease a revision during concept development. When a drawing is first checked in, when incrementing the revision, I need to do this twice to get the local revision to match the revision variable.. After that, the rev's increment/decrements fine through the workflows.

Would be nice if pdm read the revision variable and then populated the local revision with this value during initial check in.

Jason

SolidworksSolidworks Pdm/enterprise Pdm