Hello,
It seems like SW2013 is pushing precision and tolerance changes made on the hole callout in a drawing, back to the model. I don't believe we had this before in 2011. Is there a way to not have this happen? We have modeled parts that are checked in / released in EPDM that may need drawings in the future, it would be unsatisfactory to have to go and inrementally rev those just so the drawing can save with the appropriate values.
Thanks.
SolidworksDrawings And Detailing