General guideline for Time estimation for Solidworks related work

Hi Everyone,

I would like to prepare a general guideline for Solidworks 3D modeling & 2D drawings, Of course I know well, this may be depends upon the individual skill set.

But I need to show a standard time required for each modeling & Detailing. Can any one help / guide me on this?

For Example:

Making a feature like Extrude will take 20 seconds (approximately) after the sketch is drawn

Making a Loft feature will take 1 mintue (approximately) after the sketch is drawn...etc.,

Thanks & Regards

Nagu. S

SolidworksParts And Features