Good day,
We have experienced the following: When we use Task scheduler to convert our files from 2012 to 2013, it does not convert drawings that are generated automatically via a VBA process. Our standard drawings that doesn't change when we run the VBA process are however converted to 2013. Anyone else with the same experience or an answer to this challenge?
Regards.
Chris Botha.
SolidworksGeneral