Hello,
I'm new to EPDM and looking for some help on moving legacy files from a shared network drive to a vault.
Does anyone know if there is a way to force Solidworks to include all referenced files when checking in top level assembly for the first time? See the example below...the referenced files are listed but the "Check In" box is greyed out.
Thanks!
