EPDM and Toolbox Workflow Check-in

I'm very new to Enterprise. I'm working with 2014, and have added the standard SW toolbox to the epdm.

I've added %Toolbox\% to the conditions of my existing 'cad' work flow, do I need to add all the folders below the root (lang, browser, etc) to the conditions of the workflow? I had hoped to just add the Toolbox folder itself.

I ask because i'm unable to check all the files in. I've got the conditions set for all the extensions to be allowed. I can grab a couple files and check in but when i try to do a bulk checkin of all files below the 'Toolbox' i get an error 'document doesn't meet conditions of any workflow'.

Also I was curious if creating a new workflow for the Toolbox itself would be a better option.

SolidworksSolidworks Pdm enterprise Pdm