Is it possible to force users to run the Design Checker prior to allowing them to check a drawing into the vault? In other words I dont want users to be able to check things into the PDM vault until they have completed, and passed the Design Checker.
We are on SW2013 Sp 2.0 running WorkGroup PDM.
Thanks!
SolidworksWorkgroup Pdm