We currently don't use PDM but are looking at employing it.
One worry I have is that curently, each job consists of similar parts which we name "SRs" "CBs" etc.
Each part for each job is different. It doesn't cause a problem as we always close down an entire job before opening a new one.
This obviously would cause a problem if we opened two jobs at the same time. (bad practise I know but we have about 1000 jobs done in this way).
Would PDM pick up on this and cause me massive headaches?
If so, is there a way of renaming all parts & assemblies in a folder, so that the assemblies will still find the parts and sub assemblies?
Thanks in advance.
Trev