Hi guys,
I was wondering if this possible at all.
I have an assembly with 5 parts. However I need a pair so rather than the quantity saying 5 I would like it to say 10, without manually inputting the value. So can I tell SW to multiply my parts by 2 in the bom? I want to do this without having to mirror the parts or increase them in the model.
Has anyone else come across this?
Thanks
SolidworksBill Of Materials