Hi!
Is there a possibilty to connect both BOMs?
The EPDM BOM should be leading in construction. That means, when I'm changing the bom in EPDM, the drawing bom should be updated. The main task would be changing the position numbers.
I was thinking about exporting the EPDM BOM in a *.csv-file, which is going to be imported in Solidworks. This should work somehow, even when I didn't finished it yet.
But my question is, if someone has got a better idea. Maybe like a direct connection without using the csv-file?
Thanks for your help!