I do use piping routes and between 2 piping routes I do use flexible tubing. However SW does sometimes put up a fight me when placing the tubing, with the following message:
Do any of you use flexible tubing in combination with piping, if so how do you do that?
Hoping to learn some new tricks for this
SolidworksRouting