Can I tie a rev triangle to a note?

Our drawings have a standard note that we place on the sheet rather than in any individual view.  When we change that note we place a revision triangle next to it.  If we have to move the note, the rev triangle does not move with it.  Is there some way to link that rev triangle to the note so it will move with the note?  (Running SW2012).

I know we could place the note in an empty view and then place the rev triangle also in that view.  But that seems to cause other problems.  Can I simply "tie" the rev symbol to the note?

Thanks!

SolidworksDrawings And Detailing