Once I edit a part and switch back to an assembly in 2010, I get a dialog asking me if I want to rebuild. It then starts a 10 second countdown to automatically selecting something. And it appears to rebuild even if I have No highlighted when the countdown reaches zero.
Is there a way to stop that countdown?
The correct way of doing that would be to stop the countdown if I click in the box or hit tab to move around in the box, leaving box up until I select something.
Am I just missing an option somewhere? Or is it always like that?
-john
SolidworksUser Interface