So that, after the drawing is checked, another item is added to the drawing, the new item is added at the NEXT item number available, not randomly inserted into the BOM, which requires that ALL the items be checked to ensure that the new BOM agrees with the previous revision, with the addition of the new item.
Thanks,
Mike Lydon
SolidworksBill Of Materials