I'm hoping this is something that I just haven't found or atleast has been fixed in 2008 or 2009.
If I create a drawing with projected views and I decide later toshow them as broken views is there a way to break the main view andthen get the projected ones to break to match? Going along withthat, if I move the break can I get the projected view to update? Iknow Ctrl-Q doesn't do anything.
I have a drawing today that was all dimensioned and I need toadjust the break that is there and then add another break at theother end of the part. I really don't want to redo this wholething. I hope some one has a solution.
ThanksSolidworksDrawings And Detailing
If I create a drawing with projected views and I decide later toshow them as broken views is there a way to break the main view andthen get the projected ones to break to match? Going along withthat, if I move the break can I get the projected view to update? Iknow Ctrl-Q doesn't do anything.
I have a drawing today that was all dimensioned and I need toadjust the break that is there and then add another break at theother end of the part. I really don't want to redo this wholething. I hope some one has a solution.
ThanksSolidworksDrawings And Detailing