I would like to change the date on one of my drawing sheets and have all of the other sheets update the date as well. Is there a way to do this? Thank You.
SolidworksDrawings And Detailing
I would like to change the date on one of my drawing sheets and have all of the other sheets update the date as well. Is there a way to do this? Thank You.
SolidworksDrawings And Detailing