Hello,
i'am looking for the method to control the "sub-assembly order" of a Bom.
I can control the "assembly order" with
FollowAssemblyOrder2 |
But i dont know how to control the checkbox for the Setting "Follow sub-assembly order" (see screenshot)
How does it work?