Hi -
Is there a way to align two separate views that have breaks in them? For example, I have two breaks in my top view, and would like to have the breaks in the front view line up with the top view. Is there a way to do that automatically or is it just a matter of playing with the locations to get it "close".
thanks for the help!
Joe
SolidworksDrawings And Detailing