I am attempting to align a projected view horizontally with the top view and vertically with the side view. However, adding one after the other always breaks the alignment of the previous. My goal is to be able to drag one of the standard 3 views and have the projected view remain aligned with both. How can I do this in a drawing? Thank you in advance.
SolidworksDrawings And Detailing