I'm setting up a convert task to save a copy of drawings to PDF. It's pretty nifty and works, but doesn't keep the revision of the drawing file when it's added into the vault. I had all our files to reset back to Rev A, so I removed that and don't have it resetting anything. Now I get a Revision level that's blank. I'm sure I'm not the only one that has run into this.
SolidworksSolidworks Pdm/enterprise Pdm